Work Experience
Ongoing Projects
Project Ongoing : From 2025
Project Title: Supply, Laying and Compaction of Access Road Works and Structure Pad Works
CLIENT: ABU DHABI COMPANY FOR ONSHORE PETROLEUM OPERATIONS (ADNOC-Onshore)
EPCM: CHINA PETROLEUM ENGINEERING AND CONSTRUCTION CORPORATION (CPECC)
MAIN CONTRACTOR: jupiter emc llc
SUBCONTRACTOR: Falcon energy for general contracting llc
PLACE: habshan (ABU DHABI – UAE)
Scope of Work
Supply, Laying and Compaction of Access Road and 46No’s of Structure Pad Works for 10 KM which included supply of all the Earth Moving Equipment, Gutch Materials etc.
Project Ongoing : From 2025
Project Title: MEP works in 33kv substation building
CLIENT: ABU DHABI COMPANY FOR ONSHORE PETROLEUM OPERATIONS (ADNOC-Onshore)
EPCM: CHINA PETROLEUM ENGINEERING AND CONSTRUCTION CORPORATION (CPECC)
MAIN CONTRACTOR: CAPSA ENGINEERING & CONTRACTING LLC
SUBCONTRACTOR: Falcon energy for general contracting llc
PLACE: habshan (ABU DHABI – UAE)
Scope of Work
MEP works in 33KV substation building, CO2 Hub SS & ITR Building-Electrical System, CO2 Hub Guard House-Electrical System, CO2 Hub SS & ITR Building-FAC System, CO2 Hub Guard House-FAC System
Our Subsidiary company
FORTIS ENERGY OIL & GAS CONTRACTING LLC
Work Experience
Project Ongoing : From 2025
Project Title: Supply, Laying and Compaction of Access Road Works and Structure Pad Works
CLIENT: ABU DHABI COMPANY FOR ONSHORE PETROLEUM OPERATIONS (ADNOC-Onshore)
EPCM: CHINA PETROLEUM ENGINEERING AND CONSTRUCTION CORPORATION (CPECC)
MAIN CONTRACTOR: NATIONAL CONTRACTING CO. LTD
SUBCONTRACTOR: FORTIS ENERGY OIL & GAS CONTRACTING LLC
PLACE: SAHIL (ABU DHABI – UAE)
Scope of Work
Supply, Laying and Compaction of Access Road and Structure Pad Works for 8 kM which included supply of all the Earth Moving Equipment, Gutch Materials etc.
Project Ongoing : From 2025
Project Title: Skid E&I Works
CLIENT: ALI & SON
MAIN CONTRACTOR: AUTOMATION SOLUTIONS FZC
SUBCONTRACTOR: FORTIS ENERGY OIL & GAS CONTRACTING LLC
PLACE: ICAD (ABU DHABI – UAE)
Scope of Work
Electrical & Instrumentation Construction in 37 Nos of Skid which includes Electrical Equipment, Instrument installation, Cable Tray works, cable laying, Glanding & termination, QC Inspection and Pre-Commissioning works.
Our Subsidiary company
Shree AP Construction
Work Experience
Project Ongoing : From 2023
Project Title: Fabrication and Erection of Storage Tanks
CLIENT: MIRFA (ADNOC, UAE)
MAIN CONTRACTOR: Quality International LLC
SUBCONTRACTOR: Shree AP Construction
PLACE: Ruwais( Abu Dhabi-UAE)
Scope of Work
Total 4 Tanks Ongoing (Dia 112M Aluminium Doom Roof Tank 4No’s) Weight: 8000 MT associated with Piping works.
Project Completed : 2023-2024
Project Title: Erection of Tanks and Horton Sphere (9% Ni)
CLIENT: Borouge-4(ADNOC, ABU DHABI)
MAIN CONTRACTOR: INCO International FZE
SUBCONTRACTOR: Shree AP Construction
PLACE: Ruwais( Abu Dhabi-UAE)
Scope of Work
Total 4 Tanks completed (Dia 24M 1No’s; Dia 23.5M 2No’s Sphere Tanks Erection with hydrotesting associated with Piping works completed & handed over.
Project Completed : 2021-2023
Project Title: Fabrication, Erection and Hydrotest of Storage Tanks
CLIENT: HRRL Refinery
MAIN CONTRACTOR: L&T Hydrocarbon
CONTRACTOR: Shree AP Construction
PLACE: Pachpadra, Rajasthan
Scope of Work
Total 4 Tanks completed (Dia 24M 4No’s) Weight 1500 MT, Erection with hydrotesting associated with Piping works completed & handed over.
Project Completed : 2022-2023
Project Title: Fabrication, Erection and Hydrotest of Storage Tanks
CLIENT: IOCL Refinery
MAIN CONTRACTOR: L&T Construction
CONTRACTOR: Shree AP Construction
PLACE: Vadodara, Gujrat
Scope of Work
Total 4 Tanks completed (Dia 26M 2No’s; Dia 19.5M 2No’s) Weight 1480 MT, Erection with hydrotesting associated with Piping works completed & handed over.
Project Completed : 2022-2023
Project Title: Fabrication and Erection of Piping Works
CLIENT: HRRL Refinery
MAIN CONTRACTOR: L&T Construction
CONTRACTOR: Shree AP Construction
PLACE: Pachpadara, Rajashthan
Scope of Work
Total 42,000 ID Piping Fabrication & 74,000 ID Piping Erection Completed with hydrotesting Piping works completed & handed over.
Project Completed : 2021-2022
Project Title: Pipeline and Structure Works
CLIENT: HRRL Refinery
MAIN CONTRACTOR: L&T Construction
CONTRACTOR: Shree AP Construction
PLACE: Pachpadara, Rajashthan
Scope of Work
Around 250km Pipeline welding, NDT, Coating, erection associated with ROW, trenching, pre-padding, lowering, post padding and berm construction work completed. Total 3,000 MT Structural works completed & handed over.
Project Completed : 2020-2021
Project Title: Construction of Oil Storage Terminal
CLIENT: Ministry of Energy, Zambia
MAIN CONTRACTOR: Chemietech DMCC LTD, Sharjah
CONTRACTOR: Shree AP Construction
PLACE: Lusaka, Zambia
Scope of Work
Total 7 Tanks completed (Dia 36M 2No’s; Dia 26M 2No’s; Dia 31.5M 1No’s; Dia 20M 2No’s) Weight 2900 MT, Erection with hydrotesting associated with Piping works completed & handed over.
Project Completed : 2018-2019
Project Title: : Fabrication and Erection of Tankage
CLIENT: HMEL Refinery, Bhatinda
MAIN CONTRACTOR: Chemietech Projects LTD, Sharjah
CONTRACTOR: Shree AP Construction
PLACE: Bhatinda, India
Scope of Work
Total 7 Tanks completed (Dia 30M 1No’s; Dia 18M 2 No’s; Dia 24M 2No’s; Dia 8M 2No’s) Weight 2200 MT, Erection with hydrotesting associated with Piping works completed & handed over.
Project Completed : 2018-2022
Project Title: Fabrication and Erection of Tankage
CLIENT: Dangote Refinery, Nigeria
MAIN CONTRACTOR: Chemietech DMCC LTD, Sharjah
CONTRACTOR: Shree AP Construction
PLACE: Lagos, Nigeria
Scope of Work
Total 48 Tanks completed (Dia 193M 1No’s; Dia 66M 8No’s; Dia 45M 19 No’s; Dia 26M 8No’s; Dia 57.5M 12No’s), Erection with hydrotesting associated with Piping works completed & handed over.
Project Completed : 2018-2019
Project Title: Construction of Storage Terminal
CLIENT: VOPAK Lesedi Storage Terminal South Africa
MAIN CONTRACTOR: Chemietech DMCC LTD, Sharjah
CONTRACTOR: Shree AP Construction
PLACE: Heidelberg, South Africa
Scope of Work
Total 7 Tanks completed (Dia 36M 2No’s; Dia 31M 1No’s; Dia 26M 4No’s), Erection with hydrotesting associated with Piping works completed & handed over.
Project Completed : 2016-2017
Project Title: Construction of OIL Storage Terminal, Cape Town
CLIENT: VTTI, Cape Town, South Africa
MAIN CONTRACTOR: Chemietech DMCC LTD, Sharjah
CONTRACTOR: Shree AP Construction
PLACE: Cape Town, South Africa
Scope of Work
Total 13 Tanks completed (Dia 31M 4No’s; Dia 26M 6No’s; Dia 20M 1No’s; Dia 7M 2No’s) Weight 3,000 MT, Piping Fabrication & Erection around 39,000 ID, Structural 500 MT completed & handed over.
Project Completed : 2015-2017
Project Title: Structural Works
CLIENT: NTPC
MAIN CONTRACTOR: ERA Infra Ltd
CONTRACTOR: Shree AP Construction in Association with Lakshit Engineering
PLACE: Nabinagar, Bihar
Scope of Work
Total 8,000 MT Structural works Fabrication & Erection completed & handed over.
Project Completed : 2015-2016
Project Title: Fabrication of Piping and Structural Steel
CLIENT: CAIRN India ltd.
MAIN CONTRACTOR: IETS
CONTRACTOR: Shree AP Construction
PLACE: Barmer, Rajasthan
Scope of Work
Total 64,000 ID Fabrication & 93,000 ID Erection & Structural 300 MT Fabrication & Erection completed & handed over.
Project Completed : 2014-2015
Project Title: Piping and Pipeline Works
CLIENT: Reliance Refinery and Petrochemical
MAIN CONTRACTOR: Punj Loyd Ltd
CONTRACTOR: Shree AP Construction
PLACE: Jamnagar, Gujrat
Scope of Work
Around 100km Pipeline welding, NDT, Coating, erection associated with ROW, trenching, pre-padding, lowering, post padding and berm construction work completed. Total 54,000 ID Piping Fabrication works completed & handed over.
Project Completed : 2014-2015
Project Title: Structural Works
CLIENT: Reliance Refinery and Petrochemical
MAIN CONTRACTOR: SIMAR INFRASTRUCTURE LTD.
CONTRACTOR: Shree AP Construction
PLACE: Jamnagar, Gujrat
Scope of Work
Total 3,000 MT Structural works Fabrication & Erection completed & handed over.
Project Completed : 2013-2014
Project Title: Piping Works
COMPANY: Gulf Sky Cranes & Contraction Ltd
Sub Contractor: Under The Banner of G R Tanks
Work location: JUBAIL, SAUDI ARABIA
Scope of Work
Total 25,000 ID Piping Fabrication works & 35,000 Erection works completed & handed over.
Project Completed : 2012-2013
Project Title: Fabrication of Pressure Vessels
COMPANY: Indus Projects Ltd
Contractor: Under The Banner of G R Tanks
Work location: GAIL, india
Scope of Work
Total 4No’s of Pressure vessels Fabricated (3No’s Water Seal Drum & 1No’s Ethanal Pressure Vessel) Weight 500 MT Fabrication works completed & handed over.
Project Completed : 2012-2013
Project Title: Structural Works for Columns
COMPANY: G.R. ENGINEERING PRIVATE LIMITED
Sub Contractor: Under The Banner of G R Tanks
Work Location: Tarapur, India
Scope of Work
Total 700 MT Structural works Fabrication & Erection completed & handed over.
Project Completed : 2011-2012
Project Title: Bullet Tanks & Horton Sphere
COMPANY: IOT Anwesha Engineering & Construction Limited
Project: BCPL, Lepetkata, Dibrugarh(Assam)
Sub Contractor: Under The Banner of G R Tanks
Scope of Work
Total 6No’s (Dia 31 3No’s Horton Sphere Tanks completed; Dia 6.4M Length 93M 3No’s Propylene Mounded Bullet Tanks Completed), Erection with hydrotesting associated with Piping works completed & handed over.
Project Completed : 2009-2010
COMPANY: ABU DHABI OIL REFINING COMPANY (TAKREER)
CONSULTANT: TEBODIN MIDDLE EAST LIMITED
CONTRACTOR: DODSAL ENGINEERING & CONSTRUCTION PTE LTD.
SUBCONTRACTOR: MUSTANG TAMPA INC.
WORK LOCATION: Abu Dabhi, UAE
Scope of Work
Prefabrication, Erection, Welding & Hydrotest of Storage Tank Farm (Completed 02 Nos. of Fixed Roof Tanks of Dia 28 M, Weight 790 MT.
Project Completed : 2008-2009
Project Title: Mukhaizna – Central Processing and Satellite Facilities (CPFS) – OMAN
CLIENT: OCCIDENTAL MUKHAIZNA LLC (OXY)
MAIN CONTRACTOR: DODSAL & CO LLC – Dubai UAE
CONTRACTOR: CHEMIE TECH LLC
WORK LOCATION: Oman
Scope of Work
Prefabrication, Erection, Welding & Hydrotest of Storage Tank Farm (Completed 14 Nos. of Fixed Roof Tanks of Dia 48 M) Weight 4500 MT.